Surveyors accurately map out property setback lines, grade requirements, and drainage networks onto the raw field mapping grid.
Equipment: Transit level Est. time: Day 1
Heavy mechanical assets systematically strip away dead organic matter, roots, and failing pre-existing landscape frameworks.
Equipment: Skid steer / mini-excavator Est. time: Day 2-3
The field is precisely rough-graded to secure structured slope angles, mitigating risk of pooling near house foundations.
Equipment: Compact crawler loader Est. time: Day 4
Trenching out lines for automated irrigation headers and laying high-durability PVC conduit paths for low-voltage night lighting.
Equipment: Trencher / hand tools Est. time: Day 5-6
Stonemasons stack mortarless interlocking block lines to retain terraced soil heights and create stable horizontal zones.
Equipment: Laser alignment guide Est. time: Day 7-9
Crushed stone aggregate is laid down and machine-vibrated, building an unyielding, frost-heave-resistant layer for future stone flags.
Equipment: Heavy plate compactor Est. time: Day 10
Artisans position architectural stones or modular paving grids individually, managing tight joint spacing parameters.
Equipment: Diamond-blade wet saw Est. time: Day 11-13
Tilling nutrient-rich topsoil amendments into planting beds while placing featured evergreen screens and shade trees.
Equipment: Hydraulic auger / rotary tiller Est. time: Day 14
Premium instant turf is rolled, butt-jointed and rolled flat, while garden beds receive an even mulch layer for moisture retention and a clean finished edge.
Equipment: Turf roller / mulch spreader Est. time: Day 15
Irrigation and lighting systems are tested end to end, the site is detailed and cleared of all debris, and we walk the finished landscape with you before handover.
Equipment: Site inspection checklist Est. time: Day 16